Northpoint / PS / 001Discuss a Project →
03 / 01Planning and Programming

Programmes that hold up to scrutiny, at tender, during delivery, and through update.

Tender and construction programmes built in Microsoft Project and Asta Powerproject, with independent review of update cycles, sequencing, and project control through the life of the job.

Programme markup, construction schedule review
01 — Overview

Project control starts with a programme that can be defended.

Northpoint provides planning and programming support to small and mid-sized main contractors at tender stage, through live delivery, and across update cycles. The focus is practical: logic that reflects how the job will actually be built, float that is defensible, and update reviews that track delivery rather than hide slippage.

The work is written. Programmes are delivered in Microsoft Project and Asta Powerproject, with observations recorded in a format that sits alongside the contractor's own project reporting.

02
Tender stage

Tender programmes and sequencing logic.

Independent tender programmes and programme reviews, giving estimating, commercial, and delivery leads a defensible basis before submission.

  • 01Tender programme preparation in Microsoft Project or Asta Powerproject
  • 02Tender programme review and logic check on programmes provided by others
  • 03Sequencing observations aligned to the actual construction approach
  • 04Tender stage float and risk logic input
  • 05Written notes handed back ready to sit in the tender submission file
03
Live delivery

Construction programmes and update reviews.

Construction programmes, monthly update reviews, and project control observations through the life of the job.

  • 01Baseline construction programmes aligned to the contract
  • 02Monthly update reviews and progress logic checks
  • 03Sequencing and re-sequencing observations as delivery changes
  • 04Project control support alongside the contractor's delivery team
  • 05Written programme review notes, suitable for project files and reporting
04
Capability

Microsoft Project and Asta Powerproject.

  • 01Programme development in Microsoft Project or Asta Powerproject
  • 02Conversion and translation between formats where needed
  • 03Baseline setup, update cycles, and progress tracking
  • 04Read-across of contract programme requirements to day-to-day use
08Programme support

Bring planning input onto a tender, a baseline, or an update cycle.

Most planning appointments start with a short call to confirm the programme stage and the deliverable.